Engineering-first evaluation, retrofit, relocation & removal for all marine gyro systems โ including Seakeeper installed base
Request Independent Gyro AssessmentWe provide independent engineering analysis and hands-on service for marine gyro stabilizer systems โ with deep experience across the full installed base.
Independent structural, electrical, and performance analysis of installed gyro systems. Power requirement validation, hull coupling inspection, and vessel-motion baseline testing.
Learn more โTroubleshoot bearing wear, cooling failures, power anomalies, and control system faults. We service the mechanical and electrical stack โ not just the box.
Learn more โSafe decommissioning, structural patch/reinfill, and re-installation on new vessels or revised layouts. Includes crane planning and sea-trial verification.
Learn more โInterfacing gyro stabilizers with interceptor trim systems (Humphree, Zipwake), vessel monitoring, and smart power management. Holistic motion control โ not bolt-on.
Learn more โRoot-cause investigation for gyro underperformance, excessive wear, or premature failure. We document findings for insurance, warranty, or litigation support.
Learn more โHands-on operator training for captains and crew: power management, pre-trip checks, sea-state limits, and emergency procedures.
Learn more โIndependent engineering assessment, performance data, and real-world reliability notes for the most commonly installed marine gyro stabilizers.
Manufacturer service networks are optimized for warranty compliance and parts sales. Independent evaluation means your vessel's actual operational profile drives the solution โ not a service manual.
System won't spin up, faults on start, or shuts down under load. We diagnose power, cooling, bearing, and control issues.
Read diagnostic guide โSelling the vessel, repowering, or switching to a different stabilization approach. We plan safe removal and structural reinfill.
See removal process โRelocating an existing gyro to a new hull requires structural engineering, power re-validation, and sea-trial certification.
Relocation requirements โGenset can't keep up, batteries drain, or inverter faults. We audit the full electrical stack โ not just the gyro.
Power audit guide โNo obligation. No sales pressure. Just an engineering review of your vessel's stabilization needs โ with a written report you can use for any decision.
Request Assessment