Pre-Removal Structural Survey
Before touching the unit, we inspect the mounting structure, surrounding stringers, bulkheads, and deck integrity. We document the current state with photos and measurements to ensure safe extraction.
System Decommissioning
We safely power down, drain fluids where applicable, disconnect electrical and control systems, and secure all wiring to prevent damage during extraction.
Controlled Extraction
Using cranes, chain falls, or manual rigging as appropriate for the unit weight and vessel layout, we extract the gyro with zero hull damage. We protect all surrounding surfaces and systems.
Mounting Bed Restoration
After removal, we assess and repair the mounting bed. Options include filling and fairing the void, installing a new floor section, or reinforcing the area for future equipment.
Documentation & Handoff
Complete photo documentation, structural survey report, and recommendations for any follow-up work. You receive a full record for your vessel file and insurance.