Original System Analysis
Document current gyro model, serial, performance data, and mounting structure. Establish baseline roll reduction metrics from existing installation.
New Location Engineering
Structural survey of proposed new location. Weight distribution analysis, stringer load calculation, composite reinforcement specification, and custom bracket design.
Controlled Removal & Transport
Safe extraction from original location using cranes or rigging as required. Unit secured for transport within vessel to new mounting position.
New Mounting Installation
Fabrication and installation of custom mounting bed, brackets, and composite reinforcement. Precision leveling and alignment to manufacturer tolerances.
Commissioning & Sea Trial
System reconnection, startup, and operational testing. Sea trial with before/after roll data comparison to validate performance at new location.