Independent Engineering Assessment
Not affiliated with, endorsed by, or certified by Seakeeper, Inc. or any stabilizer manufacturer. No obligation. No sales pressure. Just engineering analysis.
Vessels Assessed
Avg. Performance Gain
Sales Pressure
Response Time
Takes 2 minutes. Tell us about your vessel, your goals, and your timeline.
Confirm scope, schedule, and logistics. No automated responses — real engineer review.
2–4 hour engineering audit. Hull, CG, power, structure, controls — all measured.
Findings, options, recommendations. Photos, data, and clear next steps.
No follow-up pressure, ever. The report is yours. Use it with any yard or installer.
Should you buy with a gyro already installed, or add one after purchase? We analyze the specific hull, power, and weight configuration to determine which gyro models fit, what power system upgrades are needed, and whether the factory installation meets your use case.
Which model and make is actually right for your hull form, displacement, and operational profile? We model the vessel before it's built — CG, power budget, structural loads — and recommend the optimal gyro specification. This prevents the common mistake: installing a unit that works on paper but fails under real-world continuous load.
Add a gyro to a vessel that never had one? We assess hull suitability, power system capacity, structural mounting feasibility, and control integration. Some hulls are poor candidates — we will tell you honestly. Others need foundation reinforcement, dual-bus power, or interceptor co-integration.
We will remove your unit, assess its condition, and sell it on consignment in running, pull-out condition. We also relocate units within the same vessel (re-engineering foundations) or to a different vessel entirely — a service rarely found elsewhere. Reference: M/V Saint Tony (relocation + re-engineer), M/V Invisible (foundation redesign).
The 5-layer engineering assessment process: hull, CG, power, control, and integration.
How gyros work, specification expectations, and what stabilization performance actually means.
Remote analysis, on-board audit, full engineering report, and ongoing monitoring.